Nitrogen (N₂) Pipeline Purging & Displacement Services
High-Pressure Nitrogen Pumping | Zone 2 Certified | Australia-Wide & Offshore
Hero Intro (Top Section):
Eliminate oxygen, moisture, and contaminants from pipelines with Drill and Complete’s high-performance nitrogen purging services. Delivered using our ATEX Zone 2 certified 180K nitrogen pump — fully DNV 2.7-1 compliant — we provide industry-leading pipeline purging, inerting, drying, and displacement services for the oil & gas, LNG, mining, petrochemical, and offshore sectors.
Servicing QLD, WA, NT, VIC and Australia-wide — including offshore and remote locations.
Nitrogen purging is a critical process in pipeline integrity management. It involves displacing oxygen, moisture, hydrocarbons, and other contaminants from pipelines — creating an inert, non-reactive environment that enhances safety and ensures operational readiness.
Applications of nitrogen purging include:
Pipeline commissioning
Pipeline maintenance & shutdowns
Leak testing & integrity testing
Pre-commissioning & drying
Decommissioning & abandonment
Pigging & inline inspection (ILI) support
Chemical batching
Temporary pipeline suspension
Nitrogen is the gas of choice for these applications due to its inert, non-combustible, and non-toxic properties — making it the safest and most effective medium for pipeline purging.
Delivered with Industry-Leading Equipment: 180K Zone 2 Nitrogen Pump
At Drill and Complete, we deliver nitrogen purging using our state-of-the-art 180K Zone 2 nitrogen pump, providing high flow rates and pressures required for modern pipeline operations — onshore, offshore, and remote.
Key Equipment Features:
ATEX Zone 2 Certified
DNV 2.7-1 Offshore Certified Skid
Flow Rate: 180,000 SCFH (Standard Cubic Feet per Hour)
Maximum Working Pressure: 10,000 psi (upgradeable to 15,000 psi with conversion kit)
Temperature-Controlled N₂ Discharge (~21°C)
CE Marked & Fully Compliant
Engineered for Offshore & Harsh Environments
Available as full-service nitrogen purging or dry hire with operator support.
Our Nitrogen Pipeline Services
Pipeline Purging & Inerting
Safely displace oxygen and hazardous gases to prevent oxidation, corrosion, and explosive mixtures. Essential for commissioning, maintenance, decommissioning, and hot work preparation.
Pipeline Drying & Dewatering
Achieve low dew point drying using high-pressure nitrogen to remove moisture — preventing corrosion and ensuring pipeline longevity.
Pressure Testing & Leak Testing
Perform safe, inert nitrogen pressure testing to validate pipeline integrity without introducing oxygen or flammable atmospheres.
Pigging & Inline Inspection (ILI) Support
Use nitrogen as the driving force for pipeline pigging operations — supports cleaning, caliper runs, and smart pig inspections with an inert environment.
Pipeline Suspension & Abandonment
Inert pipelines for temporary suspension or permanent abandonment — displacing hydrocarbons, water, and combustible gases to ensure safe long-term isolation.
Pipeline Chemical Batching
Enable safe chemical batching and fluid separation with nitrogen blanketing — preventing unwanted chemical reactions during the process.
Industries We Serve
Oil & Gas (Upstream, Midstream, Downstream)
Offshore Platforms & Subsea Pipelines
LNG Facilities
Mining & Resources
Petrochemical & Chemical Processing
Power Generation
Industrial Manufacturing
Food & Beverage (Specialty Applications)
Why Choose Drill and Complete?
ATEX Zone 2 & DNV 2.7-1 certified nitrogen pumping
15,000 psi capable — ideal for modern pipelines
Proven experience in oil & gas, LNG, mining & offshore sectors
Full-service or dry hire options
Rapid mobilisation — Australia-wide & offshore
24/7 operational support
Trusted by major operators — Beach Energy, Iluka Resources, and more
How Our N₂ Purging Services Work
Step 1: Project Consultation & Scope Definition
Step 2: Mobilisation of 180K N2 Pump & Crew
Step 3: Onsite N2 Purging & Testing — safe, efficient, compliant
Step 4: Verification & Reporting — ensure system integrity
Compliance & Safety
ATEX Zone 2 Compliant
DNV 2.7-1 Certified Equipment
Australian Standards & Industry Best Practice
Experienced, trained operators
Full safety case documentation
24/7 emergency response capability
Case Study Example: Offshore Pipeline Commissioning — NW Shelf
Client: Major oil & gas operator (offshore platform)
Scope: Pipeline purging, drying, and pressure testing of 36” gas export pipeline prior to commissioning.
Solution:
- Mobilised 180K N2 Pump via supply vessel
- Delivered multi-phase nitrogen purging & drying
- Achieved required dew point and oxygen content within <48 hours
- Delivered safe, certified pipeline ready for startup
Final CTA:
Need Expert N₂ Purging for Your Pipelines?
Contact Drill and Complete today for:
Pipeline commissioning
Shutdown & maintenance
Integrity testing
Offshore nitrogen services
